Phase I Environmental Site Assessment, Part 2
Posted on February 13, 2013 by EBA EngineeringThe Scope of an Environmental Phase I Site Assessment normally includes looking for potential soil contamination, groundwater quality, surface water and sometimes issues related to hazardous substance uptake by plant and animal life. The examination of a site may include but is not limited to: Definition of any chemical residues within structures Identification of possible […] Continue reading
California Stormwater Pollution Prevention Plan (SWPPP)
Posted on February 11, 2013 by EBA EngineeringWhat’s an SWPPP? A Storm Water Pollution Prevention Plan is a plan to describe a process whereby a facility evaluates potential pollutant sources at a site and selects and designs appropriate measures to prevent or control the discharge of pollutants in storm water runoff. The regulatory entity responsible for such plans is the NATIONAL POLLUTANT […] Continue reading