Posts by rmazook
Highlands Mutual Water Company Hydrogeologic Study & Well Sitings
Highlands Mutual Water Company Hydrogeologic Study & Well Sitings Clearlake, CA EBA serves as Engineer of Record for Highlands Municipal Water Company (HMWC), providing a variety of engineering and environmental services including a Hydrogeologic Study and Well Sitings for the addition of a municipal water supply well to supplement the existing source. The hydrogeologic study…
Read MoreCity of Willits Water System Infrastructure Engineering & Environmental Services
City of Willits Water System Infrastructure Engineering & Environmental Services Willits, CA EBA is assisting the City of Willits with a wide range of groundwater, environmental, and civil engineering services related to the City’s water system infrastructure. EBA’s scope of work includes groundwater studies, groundwater flow modeling, lead service line inventory (LSLI) compliance services, and…
Read MoreCounty of Sonoma Buried Waste Investigation
County of Sonoma Buried Waste Investigation Healdsburg, CA Buried waste materials were encountered in during the construction of an emergency vehicle access (EVA) roadway at the Healdsburg Landfill in an area which was outside of the permitted boundary. Several phases of investigation were completed at the site that included a geophysical survey and the installation…
Read MoreSouth Cloverdale Water Company Public Water System
South Cloverdale Water Company Public Water System Engineering & Environmental Services Cloverdale, CA The South Cloverdale Water Company (SCWC) serves 90 people through 38 service connections. The water system is under a Compliance Order issued by the State Water Resources Control Board, Division of Drinking Water, which required the SCWC to procure an alternate source…
Read MoreRound Barn Soil & Groundwater Investigation, Remediation & Case Closure
Round Barn Soil & Groundwater Investigation, Remediation & Case Closure Santa Rosa, CA EBA was contracted to perform multiple phases of environmental investigations and subsequent remedial action associated with a significant historical release of petroleum hydrocarbons. EBA performed several subsurface investigations to delineate the extent of soil and groundwater contamination which would require remedial action…
Read MoreSouth Fork Lost River
South Fork Lost River Flow Enhancement Geotechnical Investigation Mendocino County, CA EBA prepared a Geotechnical Investigation Report for the South Fork Lost River Flow Enhancement Project, Tributary A, located in the upper reaches of the Mattole River watershed of northern Mendocino County, California. This groundwater recharge project utilizes subsurface cutoff walls to retain wet season…
Read MoreVisalia Landfills Environmental Monitoring
Visalia Landfills Environmental Monitoring Tulare County, CA EBA has been providing landfill engineering services at Visalia Landfill since 1999. These services have encompassed permitting, design, construction management, site characterization, and environmental reporting. Scope of services are as follows: Final design and permitting of WMU-I’s final cover system. The final cover system design employed an engineered…
Read MoreEast Bay MUD Photovoltaic Array System Construction SWPPP
East Bay MUD Photovoltaic Array System Construction SWPPP Orinda, CA EBA was contracted by TotalEnergies Renewables USA to provide Construction Qualified Stormwater Practitioner (QSP) services in connection with the implementation of a Storm Water Pollution Prevention Plan (SWPPP) and associated QSP services for the planned EBMUD Next Tracker Gemini Photovoltaic Array System in Orinda, California.…
Read MoreCounty of Sonoma Monitoring Well Installations & Abandonments
County of Sonoma Monitoring Well Installations & Abandonments Annapolis, CA EBA prepared a Monitoring Well Installation Work Plan for the Annapolis Landfill proposing the installation of replacement monitoring wells MW-9R and MW-10R as well as the proper abandonment of five dry and/or non-functional monitoring wells which was subsequently approved by the North Coast Regional Water…
Read MoreEast Bay MUD Photovoltaic Array System Construction SWPPP
East Bay MUD Photovoltaic Array System Construction SWPPP Orinda, CA EBA was contracted by TotalEnergies Renewables USA to provide Construction Qualified Stormwater Practitioner (QSP) services in connection with the implementation of a Storm Water Pollution Prevention Plan (SWPPP) and associated QSP services for the planned EBMUD Next Tracker Gemini Photovoltaic Array System in Orinda, California.…
Read More